your note✎ jotted on your note
Oberlausitz · Niesky

Campground in Niesky

Our backyard meadow, located right on the edge of the woods and only 5 minutes from a beautiful lake with year-round camping access.1

What 1NITE TENT writes

„The meadow behind our house, which is located directly at the forest, is available as a camping site.
In 5 minutes you can walk to a beautiful forest lake.
The toilet in the house can be used.
Also a fireplace is available.“

Read more on 1NITE TENT ↗

Suitable for

  • Tent

Sights in the area1

Hochwald-Turmbaude

Mountain inn with a lookout tower on the Hochwald in the Zittau Mountains; from the top the view runs across the ridges into Bohemia. A target for clear autumn days.

Senftenberger See lookout tower

The tower overlooks the Lusatian Lake District, flooded open-cast mines with sandy beaches. Worth it above all on days when the forest lake stays too cold for swimming.

Fürstenzug in Dresden

Mural of Meissen porcelain tiles on the palace wall, freely accessible and the easiest start for a walk through the old town. Dresden is 74 kilometres away.

1 Machine-written texts — they may contain errors. The description on 1NITE TENT applies.