Wooden platform for tent(s) (Campspace 29315)
What Campspace writes
„Experience nature up close in our Campspace in Bad Peterstal-Griesbach. Our site offers“
Suitable for
Tent
Sights in the area
On the Feldberg
Feldberg is the highest mountain in Germany. It is located in the Black Forest, which is one of the most beautiful places in the world. It has a long history and many legends that make it an interesting place. Here you can see all kinds of wildlife, including deer, foxes and even bears!
Waterfalls Sankenbach
There are many beautiful sights to see in the Black Forest and one of them is the Sankenbach waterfall. This waterfall has a bridge leading up to it and when you open the dust board at the top, it's like opening a sluice as the water rushes down from above. It's also perfect for kids!
Triberg waterfalls
Triberg Waterfall is the highest in Germany and has been located outside the city for over 150 years. It is one of the most beautiful natural wonders in Europe, where the water plunges 163 meters into the depths. The sound of rushing water will fill your ears while you enjoy this breathtaking sight.
Noblewomen grave waterfalls gorge
Edelfrauengrab waterfall Klamm is one of the most beautiful places in the Black Forest. It's not just about the waterfall, but also about exploring and hiking through this area. You can hike here over steps and footbridges to get up close and personal with nature and see some really cool waterfalls along the way. If you want to learn more, there are panels that tell a story about an eerie noble burial ground nearby.
Schluchsee - east shore
Schluchsee is a beautiful lake in the heart of the Black Forest. It is 7.5 kilometers long and one of the largest lakes in Germany. You can swim here all year round, because the water temperature stays around 12 degrees Celsius even on hot summer days!
Feldberg summit (Highest point Baden-Württemberg)
Feldberg is the highest point in Baden-Württemberg and one of the most popular destinations in Germany. It is also home to some of the best ski resorts in Europe, making it perfect for winter sports enthusiasts. In summer, visitors can hike on the many hiking and biking trails or fish at Lake Titisee.