your note✎ jotted on your note
Lüneburger Heide · Schneverdingen

Campsite in Schneverdingen

A fenced property in Schneverdingen, Lüneburger Heide, with space for your tent. Overnight stays are only possible by prior arrangement, as dogs roam the grounds and chickens scratch around in the garden. Hunting-prone four-legged friends are therefore better left at home. A toilet is not always guaranteed, and parking should be clarified in advance. All around the heath: the Pietzmoor with its wooden boardwalks over dark water, the Brunsberg for views across the landscape. In the evenings, there's scratching in the garden.1

What 1NITE TENT writes

„Fenced property. Parking by arrangement. Pets allowed by arrangement (chickens in garden, so please no hunting dogs). Toilet cannot always be guaranteed.“

Read more on 1NITE TENT ↗

Suitable for

  • Tent

Sights in the area1

Pietzmoor

The largest bog in the Lüneburg Heath, crossed by a boardwalk over black peat. A full loop takes about two hours and works in drizzle too.

Brunsberg

A heath hill with a wide view across the open land, all purple when the heather blooms. The short climb pays off early, before anyone else is up there.

Totengrund

A dry valley in the heath, fringed with juniper and best taken in from the rim above. The classic choice for an afternoon with no fixed plan.

Hamburg

About 54 km away: the Außenalster, the harbour and Kaltehofe island with its old waterworks. The fallback when the heath disappears into rain.

1 Machine-written texts — they may contain errors. The description on 1NITE TENT applies.