your note✎ jotted on your note
Schossin

Camping in Schwerin Outback at Heiligensoll

Camping im Schweriner Outback am Heiligensoll is situated on a peaceful farmstead in the small village of Schossin in the Lüneburger Heide. Two fenced meadows and a private woodland area with a natural pond offer plenty of space to relax. Nature enthusiasts can observe numerous wildlife here, from kites and buzzards to roe deer and hares. Thanks to low light pollution, you can expect an impressive starry sky in the evening. Excursions to Pietzmoor or Totengrund are well worth it, as is a visit to the Hanseatic city of Lübeck, which is only around 49 kilometres away.1

What Hinterland writes

„Quietly situated remainder farm on the Heiligensoll, on the outskirts of a 100-resident village. Two fenced meadows (one level, one with a gentle south-facing slope) are available for self-sufficient campers.“

Read more on Hinterland ↗

Suitable for

  • Motorhome
  • Caravan
  • Tent

1 Machine-written texts — they may contain errors. The description on Hinterland applies.