Winery and tavern
We run a family-run winery with a seasonal open Straußwirtschaft. The vinotheque is open all year round. Our winery is located on the edge of the vineyards in the well-known Bischoffingen, from here you have a beautiful view of our vines and an evening sunset over the Vosges - or for some fresh air during your stay! You can stop by anytime we're open; either at 4pm when it's happy hour time, or at 10am before you head out to explore other parts of Alsace-Lorraine (or France). Our offerings next door come straight from our mouths: homemade wines, French cheese boards, as well as salads made daily right around the1
What AlpacaCamping writes
„We run a family-run winery with a seasonal open Straußwirtschaft. The wine shop is open all year round.
Our winery is located on the edge of the vineyards in the well-known village of Bischoffingen.“
Suitable for
Motorhome
Caravan
Tent
Sights in the area1
Kaiserstuhl
An old volcanic massif rising from the Rhine plain, densely planted with vines and known for its warm, dry summers. Trails wind through the terraces.
Freiburg im Breisgau
About 18 kilometres away: a red-sandstone minster and the little Bächle water channels in the lanes. A rainy day with plenty to do.
Schauinsland
Freiburg's local mountain, reached by one of Germany's longest circulating cable cars. From the top, wide views over the Rhine plain and Black Forest.
1 Machine-written texts — they may contain errors. The description on AlpacaCamping applies.