Idyllic tent meadow at the hillside grove

The Biohof is a small, secluded field near the woods with room for tents. It feels like camping and there's plenty of electricity as well as water access on site - all you need are some drinks from our campfire before setting out into nature! If it rains then simply find dry wood amongst those gathered behind us: we've got what your fire needs right here at The Organic Farm Deidesheim-Stauffenbergring 48 Elsenburgerstraße 55aints Umhausener Tal 78km away). You can also ride horses or look after donkeys if that interests you. The tone should¹

Idyllic tent meadow at the hillside groveWittstock/Dosse OT Zempow

Behind our organic farm, in a small, sheltered valley at the edge of the forest, lies our tent meadow. Here it feels like wild camping. There is electricity, water, a composting toilet and a campfire ...

Read more on MyCabin

MyCabin, from 26 €

Suitable for Tents

 Add to watch list
¹ This text was generated by machine and may contain errors. The description on MyCabin applies.

Or discover these great pitches nearby:

Other pitches in the vicinity